Use of the chain hoist and electric hoist

 

Newly installed or installed after dismantling the electric hoist, First empty commissioning several times. But not pre-installed, avoid power-commissioning.

2. Should be carried out before the normal use of 125% of the rated load, lifting off the ground about 100 mm, 10-minute static load test, and check whether it is normal.

Dynamic load test is based on the weight of the load rating for repeatedly lift and move around test after test to check the mechanical transmission parts, electrical parts, and a connecting portion is normal. Not allowed in the environment, and exceed the rated load and hourly rated switch (120) in the case of using absolute prohibition.

Installation, commissioning and maintenance must strictly check limit device is flexible and reliable, when hook up to the upper limit position, the hook shell to roll the shell of the distance must be greater than 50mm (10t, 16t, 20t must be greater than 120mm ). When the hook down to the lower limit position, should ensure the reel wire rope safety circle, the effective security ring must be more than 2 laps.